Skip to content

NewsUS

EVgo passes 4,000 stalls on its US public charging network

The operator ended September with 4,020 public stalls and reported more than 290 native NACS connectors in service by 6 November.

EDC Editorial1 min read
A driver using her phone beside an EVgo fast charger at Tech Ridge Center, Austin, Texas; company archive photograph
A driver using her phone beside an EVgo fast charger at Tech Ridge Center, Austin, Texas; company archive photograph. Photo: © 2026 EVgo Services LLC. Used with Permission.

EVgo had 4,020 fast charging stalls on its own public US network at the end of September, up from 3,570 a year earlier. Its quarterly results, released on Monday, also put the number of operational NACS connectors above 290 as of 6 November, giving drivers of cars with the North American plug more places to charge without an adapter.

The company reported 5,530 stalls across all its operations. That larger number includes 1,390 built through its eXtend partnerships and 120 reserved for autonomous vehicle fleets. EVgo said it added 160 new DC fast charging stalls during the third quarter.

Drivers took 103 GWh from the public network during the quarter, 8% more than a year before. Use per stall was lower: the daily average fell from 295 to 283 kWh. EVgo pointed to weaker demand late in the summer and lower use of some older, lower-power equipment. Excluding sessions from automaker charging programmes, daily energy delivered per stall rose 7% year on year.

The latest outlook calls for 1,075 to 1,275 new stalls across its operations in 2026. Those are full-year deployment figures, not a promise of that many additional public plugs by December.

Sources

Questions about this?

Ask the club. Someone has probably been there.

Start a thread

Keep reading