NewsEurope
Fastned opens eight 400 kW charging points at Kenn
The Mosel-Einkaufszentrum site is Fastned’s 70th German station, with two extra-wide drive-through bays and round-the-clock access.

Fastned has opened eight charging points offering up to 400 kW each at the Mosel-Einkaufszentrum in Kenn, Germany. The station, its 70th in the country, opened on 19 November alongside the shopping centre’s relaunch by ALDI SÜD.
Two extra-wide drive-through bays provide space for longer vehicles and cars towing trailers. The chargers sit beneath Fastned’s yellow-edged solar canopy, with lighting and cameras at the site. Access is available 24 hours a day.
The entrance is off the L145, around two minutes from the A602 and E44. Drivers can pay at a terminal with a debit or credit card, use an NFC charging card or start a session through the Fastned app.
The shopping centre is returning after roughly five years of vacancy. Local newspaper Wochenspiegel reports that some facilities will arrive later: the medical centre is due in January 2027 and a separate REWE drinks market in March. The main retail and food outlets provide places to spend a charging stop.
Sources
Keep reading
NewsUS1 min read
US fast-charging sites grow larger as quarterly sessions pass 50 million
TEI’s third-quarter report finds more plugs at new sites and a growing share of 400 kW equipment, while first-attempt charging success is broadly unchanged.

NewsUKEurope1 min read
Vauxhall–Opel signs Leapmotor deal for a new SUV due in 2028
The new model will use Leapmotor components and be built in Zaragoza, Spain, with Vauxhall and Opel handling design, chassis and cabin development.

NewsEurope1 min read
Volkswagen gives the electric Polo GTI a 270 kW Clubsport concept
The two-seat concept borrows a motor from Volkswagen’s larger EVs and sends 550 Nm through the front wheels. Its public debut is set for Essen.