NewsEurope
France changes the paperwork for public EV charger grants
New Advenir applications must link directly to the charge points in the national database.

France’s Advenir programme has changed how operators prove that publicly accessible EV chargers have been listed in the national database. For grant files signed from 15 November, applicants must submit a filtered link that identifies the charge points in their project. Advenir announced the change on 2 November and put it into effect on Sunday.
A link to the full national list is too broad. Applicants can narrow it by the organisation responsible for the installation, the station address or the charge point ID. Files signed before 15 November can also use links from the new national database, though the programme does not require them to follow the new format.
The underlying duty to publish public charger details was already in place. Those records give maps and route planners a source for details such as a charger’s location and connector types. The change gives Advenir’s grant team a quicker way to check whether the chargers named in an application can actually be found in that data.
Sources
Keep reading
NewsUS1 min read
US fast-charging sites grow larger as quarterly sessions pass 50 million
TEI’s third-quarter report finds more plugs at new sites and a growing share of 400 kW equipment, while first-attempt charging success is broadly unchanged.

NewsUKEurope1 min read
Vauxhall–Opel signs Leapmotor deal for a new SUV due in 2028
The new model will use Leapmotor components and be built in Zaragoza, Spain, with Vauxhall and Opel handling design, chassis and cabin development.

NewsEurope1 min read
Volkswagen gives the electric Polo GTI a 270 kW Clubsport concept
The two-seat concept borrows a motor from Volkswagen’s larger EVs and sends 550 Nm through the front wheels. Its public debut is set for Essen.