NewsEurope
Dutch public chargers can slow down when the local grid is busy
Participating charge points in Utrecht, Gelderland and the Flevopolder can temporarily cut power. At many locations, drivers who need their car sooner can opt out.

Some public charge points in Utrecht, Gelderland and the Flevopolder can now slow a charging session or briefly pause it when the local electricity network is busy. The Dutch grid operator Liander says the approach can be used from 12 November in the three areas, with Noordoostpolder and Urk excluded from the Flevopolder rollout.
The grid operator tells the charging company when and where it needs to free up capacity. The company adjusts power at participating points and restores normal speeds when the pressure passes. A session may take longer, and the effect can vary between streets or even between visits to the same charger.
Drivers who need to leave sooner can opt out in most cases, according to Liander. The option depends on the charge point and its operator. Some providers send a notification before or at the start of charging. Qwello, one of the operators taking part, says its chargers adjust automatically and that it may lower power during morning or evening demand peaks.
Sources
Keep reading
NewsUS1 min read
US fast-charging sites grow larger as quarterly sessions pass 50 million
TEI’s third-quarter report finds more plugs at new sites and a growing share of 400 kW equipment, while first-attempt charging success is broadly unchanged.

NewsUKEurope1 min read
Vauxhall–Opel signs Leapmotor deal for a new SUV due in 2028
The new model will use Leapmotor components and be built in Zaragoza, Spain, with Vauxhall and Opel handling design, chassis and cabin development.

NewsEurope1 min read
Volkswagen gives the electric Polo GTI a 270 kW Clubsport concept
The two-seat concept borrows a motor from Volkswagen’s larger EVs and sends 550 Nm through the front wheels. Its public debut is set for Essen.