Skip to content

NewsEurope

Dutch public chargers can slow down when the local grid is busy

Participating charge points in Utrecht, Gelderland and the Flevopolder can temporarily cut power. At many locations, drivers who need their car sooner can opt out.

EDC Editorial1 min read
Two plugs connected to a municipal charge point in Utrecht, Netherlands, August 2016 archive photograph
Two plugs connected to a municipal charge point in Utrecht, Netherlands, August 2016 archive photograph. Photo: Biontologist / Wikimedia Commons, CC BY-SA 4.0, display crop

Some public charge points in Utrecht, Gelderland and the Flevopolder can now slow a charging session or briefly pause it when the local electricity network is busy. The Dutch grid operator Liander says the approach can be used from 12 November in the three areas, with Noordoostpolder and Urk excluded from the Flevopolder rollout.

The grid operator tells the charging company when and where it needs to free up capacity. The company adjusts power at participating points and restores normal speeds when the pressure passes. A session may take longer, and the effect can vary between streets or even between visits to the same charger.

Drivers who need to leave sooner can opt out in most cases, according to Liander. The option depends on the charge point and its operator. Some providers send a notification before or at the start of charging. Qwello, one of the operators taking part, says its chargers adjust automatically and that it may lower power during morning or evening demand peaks.

Sources

Questions about this?

Ask the club. Someone has probably been there.

Start a thread

Keep reading

Dutch public chargers can slow down when the local grid is busy · Electric Drive Club